Runco 3Dimension D-113d Spezifikationen Seite 47

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 152
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 46
Installation
D-113d Projection System Installation/Operation Manual 31
PRE
L
IMINAR
Y
Attaching the Top and
Bottom Projection Units
to Each Other
1. With the help of an assistant, carefully lift the top projection unit and place it right
side up on a flat surface.
2. Repeat Step 1 for the bottom projection unit.
3. Carefully lift the top projection unit and place it on top of the bottom projection unit.
Ensure that the bottom of each spacer leg mates with the pocket at each corner on
the top of the bottom projection unit.
4. Using a hex wrench and eight (8) of the supplied, M6 x 16mm socket-head cap
screws, secure the spacer legs to the bottom projection unit as shown in Figure 3-8.
Figure 3-8. Securing the Top and Bottom Projection Units to Each Other
Seitenansicht 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 ... 151 152

Kommentare zu diesen Handbüchern

Keine Kommentare